Number 153 – Check and Verify Resources Audie Penn, September 18, 2026November 24, 2026 Number 153 – Check and Verify Resources Check and verify that necessary resources for improvement are available and being properly utilized. Practitioners: tactical, integrative, and strategic Approval is the moment most organizations consider the resource question settled. Budget is released. Names appear on a team roster. Time is allocated, at least on paper. The statement contains two verbs, not one. Check, and verify. To check is to ask whether the resource exists. To verify is to confirm that it is doing what it was intended to do. Most improvement efforts do not fail for lack of approval. They fail in the distance between those two verbs. A person assigned to an improvement team is not the same as a person available to it. The assignment is real. The calendar is also real. When the two conflict, the calendar usually wins, and it wins quietly — a missed observation, a session rescheduled twice, an analysis completed by whoever had time rather than whoever had the knowledge. No one refuses. The work simply thins, and the thinning is difficult to see until results arrive. Utilization carries its own failure mode. Resources can be fully present and still poorly used. A capable engineer who spends three weeks assembling data that already existed elsewhere in the organization is a resource consumed rather than applied. A team that meets faithfully but spends most of its time preparing status summaries is occupied, not engaged. Availability Is a Leadership Decision Protecting a resource means deciding what it will not do. An organization that assigns people to improvement work without removing anything from their existing load has not allocated a resource. It has expressed a preference and hoped. The people involved understand this immediately, even when it is never said aloud, and they make the arithmetic work the only way available to them — by giving the improvement effort what remains after the daily work is done. Verification is uncomfortable for exactly this reason. It exposes the gap between what leadership said mattered and what leadership was willing to stop. A check confirms the paperwork. A verification confirms the intent. One is administrative; the other is honest. Improvement rarely fails because an organization was unwilling to invest. It fails because the investment was announced and never confirmed. Questions For Your Consideration When we assign people to improvement work, what do we remove from their existing responsibilities? Where resources were approved, when did we last confirm they are actually being applied to the problem? Are our improvement resources being consumed by preparation and reporting rather than by the work itself? What would our teams say if asked whether the support they were promised has arrived? More OpEx 4 OpEx OpEx 4 OpEx